Pool-KreteŽ is a factory prepared blend of exfoliated vermiculite and portland cement with special additives to aid in mixing, pumping, placing and troweling of materials.

Mix each bag of pool base with water for pool base to be used under vinyl liner pools. The number of bags required is based on the pool size.

A foundation of Pool-KreteŽ will help your vinyl lined pool last longer than those with a foundation of sand/cement -- there's none of the abrasion. A Pool-KreteŽ foundation also adds to the beauty of your vinyl lined pool -- there's no unsightly footprints or rust discoloration. And a vinyl lined pool with a Pool-KreteŽ foundation is also easier and less expensive to maintain than those with sand or concrete foundations. 

If you've made the decision to install a vinyl lined pool, do yourself a favor and use Pool-KreteŽ for your foundation. Longer lasting, more attractive, and easier to maintain, Pool-KreteŽ brings out the best in any vinyl lined pool.

Pool-KreteŽ Application Instructions for Vinyl Lined Pools

What is Pool-KreteŽ 
Pool-KreteŽ Premix is a quality blend of expanded vermiculite, portland cement, and admixtures designed to be mixed with water and troweled to form a long-lasting hard bottom for in-ground vinyl-lined swimming pools. The proper use of Pool-KreteŽ will enhance the quality of the pool installation and prolong the life of the vinyl liner. 

Pool-KreteŽ is a porous but rigid liner base which offers numerous benefits to both the pool installer and the pool owner. With no waste and minimal clean up, this professional approach to hard bottom installations results in greater customer satisfaction and can result in increased referral business. 

Tools Required
  • Shovels
  • Trowels -- approximately 4" x 12" round-edged and flexible
  • Mortar Mixer (5 cubic foot capacity or larger) or Pool-KreteŽ Mixer/Pump
  • Five Gallon Bucket
  • Fifty-five (55) Gallon Drum
  • Wood Floats - approximately 4" x 18"
  • Wheelbarrow
About the Excavation
Naturally, the excavation of the pool area should be as accurate as possible after carefully reading the pool manufactur's specifications. The recommended thickness of the Pool-KreteŽ should be between 1" to 2". 

If the pool manufacturer's specifications are finished dimensions, an extra 1" to 2" will be needed to accommodate the hard bottom and hopper walls. Carefully set up string lines to accommodate the proper thickness of the Pool-KreteŽ. Use re-bars to connect the lines as illustrated. 

Pool-Krete Application Instructions 
Illustration 1 

Important: The accuracy of the excavation will determine the number of bags of Pool-KreteŽ needed for the job. If the hole is cut too deep or too large the requirements will increase. 

Note: After excavation, the bottom and hopper wall should be fine graded with a shovel to the line and raked free of excess loose dirt. Loose dirt and rocks should be removed. Do not tamp or attempt to pack loose debris as this will result in a non-suitable base for the Pool-KreteŽ and will encourage erosion of the bottom and sides. 

Benefit: Pool-KreteŽ properly installed will outlast packed sand or sand/cement bottoms due to its high adheasion characteristics which prevents wash-outs and liner abuse due to abrasions. 

Any recesses left by over digging or rock removal should be dry-packed with Pool-KreteŽ and allowed to stiffen before the bottom is installed. 

Conditions to Observe Before Installation 
Moisture in the Excavation
 

Extremely wet hopper walls and bottom resulting from recent rainfall should force postponement of the Pool-KreteŽ installation for at least a day or until the walls dry out. Pool-KreteŽ will not adhere properly to mud. The adhesion of Pool-KreteŽ will not be adversely affected if the walls or bottom are merely moist. 

Note: Installation of Pool-KreteŽ on extremely hot days can be simplified by slightly wetting down hopper walls and bottom with a gentle mist. This will prevent the dry dirt from absorbing moisture out of the Pool-KreteŽ too quickly. This practice will minimize cracking and ensure proper setting-up. 

Hopper Wall Seepage 
Pool installation in geographical areas where water seepage is observed to be a problem can be remedied and controlled. Seepage occurring where the hopper walls converge can be controlled by digging a trench approxi-mately 6" wide by 6" deep into the wall; filling 1" washed gravel; covering with visqueen, polyethylene or empty Pool-KreteŽ bags; then dry-packing with Pool-KreteŽ. After Pool-KreteŽ has stiffened, installation of the Pool-KreteŽ onto the hopper walls can proceed. 

Hopper Bottom Seepage 
This problem will not go away unattended. One recommendation is to excavate the hopper bottom a foot or so deeper than specifications require; spread approximately 4" of washed gravel into the bottom; install a small sump pump on top of the gravel with a flexible drain hose inserted up through the trench outlined on page 6 (see Illustration 2); and backfill the bottom with an additional 8" of washed gravel. Cover the bottom with visquee and then proceed with Pool-KreteŽ installation. The drain hose mentioned above should extend out of the pool area, as a permanent fixture and should be plugged after the removal of the groundwater, subsequently used again if the need arises. 

The pump should continue to run, removing all water after installation of Pool-KreteŽ and until liner is installed and pool filled with water to the level of the wall panel bottoms. Only then should the pump be shut off. 

If seepage occurs across one or more of the hopper walls, the following recommendation can be used. Repeat steps outlined in next sections and above (see Illustration No. 2). In addition, add a horizontal trench connecting into the above (see Illustration No. 2), as well as a vertical trench running from the middle of the horizontal trench into the hopper. This procedure should be repeated for each wall where seepage is observed. 

Pool-Krete Application Instructions 
Illustration No.2 

Mud in the Hopper Bottom 
A muddy condition in the hopper bottom resulting from rainfall can be remedied by working hydrated lime into the problem area at a rate of 100 lbs. per 9 square feet. After stiffening, Pool-KreteŽ installation can proceed. This procedure will be more effective and less costly than simply adding dry Pool-KreteŽ to the muddy areas. 

Rain During Installation 
Although Pool-KreteŽ should not be used during a rain, there will be occasions when the weather simply rolls in quickly during installation. If possible, cover the pool area with polyethylene. A light mist will generally not affect the Pool-KreteŽ. Large drops or heavy rainfall, however, will cause the wet Pool-KreteŽ to pock-mark or even wash out. 

Helpful Hint: Pool-KreteŽ that has pock-marked can be easily repaired by first sweeping the surface lightly, re-moving the irregularities and then with plaster-wet Pool-KreteŽ mix, lightly trowel over the affected areas with a thin top coat. This will restore the bottom to its intended surface texture. 

Mixing
Mortar Mixer
 
A conventional mortar mixer five cubic feet capacity or larger can be used to mix Pool-KreteŽ with water. Naturally, the larger the mixer the larger the batch. Approximately five to six gallons of water should be poured first into the mixer followed by a bag of Pool-KreteŽ. 

Helpful Hint: Weather conditions will dictate the amount of water needed to properly mix one bag of Pool-KreteŽ. Hot, windy conditions will dry out the Pool-KreteŽ faster than will cool, cloudy conditions. An additional two or three quarts per bag may be necessary on a hot, sunny day. The extra water will allow easier troweling and minimize cracking of the Pool-KreteŽ. 

Hairline cracks can be expected to occur using any cement-based product and should not cause alarm. Stress cracks can be caused by too rapid hydration and, if desired, can be cosmetically eliminated by lightly troweling some dry Pool-KreteŽ over the affected area. 

Mixing Time 
After the Pool-KreteŽ has been added to the water, mixing time should not exceed two minutes. Mixing should continue until all dry pockets of Pool-KreteŽ have disappeared into a wet, uniform consistency. Over mixing will cause the vermiculite particles to break down and can result in troweling problems. 

Benefit: The vermiculite in Pool-KreteŽ provides the porosity necessary in a lightweight concrete. This poros-ity is a primary benefit to the hard bottom as it is responsible for allowing water to pass through during periods of rising water tables. In an empty pool, the water will pass through the hard bottom and unseat the liner. As the water table recedes, the water in the pool will reverse its passage down through the Pool-KreteŽ hard bottom. This important benefit is an advantage over other types of pool bottoms since it prevents shifting, wash out, cracking, and expensive bottom repair. 

Pool-KreteŽ Mixer and Pump 
This specialized piece of equipment used by builders who annually install high volumes of pools adds speed, efficiency, and further consistency to the installation of hard bottoms. With the pump and 75' hose, the Pool-KreteŽ can be placed accurately into the pool without wheelbarrows and buckets. Labor saving speed is the key factor when using a Pool-KreteŽ machine. A unique feature of the Pool-KreteŽ mixer is the contra-blend paddles used to mix the Pool-KreteŽ and water. 

Unlike a mortar mixer, the Pool-KreteŽ machine folds the mixture gently without degrading the vermiculite particles. Mixing time, however, should not exceed 1 minute. 

Benefit: Yields of Pool-KreteŽ in these machines will increase dramatically as a result of the special designed paddles. 

After mixing, the Pool-KreteŽ should be discharged out of the mortar mixer (if used) into a mortar box or wheelbarrow. After discharge, it is important to repeat the first step of adding water to the mixer for the next batch regardless of the time interval between batches. This will prevent any leftover material from adhering to the paddles or mixer causing unnecessary clean up or down time. 

Helpful Hint: For ease of installation, one recommendation is to set up the mortar mixer at one corner of the shallow end. This can be accomplished by backfilling the selected corner with dirt. Setting the mixer close to the pool wall allows the Pool-KreteŽ to be discharged over the wall to a waiting wheelbarrow, resulting in time savings and eliminating excessive moves of the mixing operation as the installation proceeds into the shallow end. 

Helpful Hint: When setting up the mixing operation on the outside corner of the pool, drape a sheet of polyeth-ylene over the pool wall to avoid splattering of the Pool-KreteŽ. This will eliminate any extra clean up. 

Placement of Pool-KreteŽ 
Prior to the placement of the Pool-KreteŽ, form a dam on the outside of the pool wall to fill any large gaps between the bottom of the pool wall panels and the ground. This can be accomplished with either the concrete footing used to anchor the wall braces or packed backfill. (See Illustration No. 3.) 

Helpful Hint: The 55 gallon drum recommended allows the mixer operator a continuous and ample supply of water not always available through a common garden hose. Prior to beginning the hard bottom installation, the operator should have a batch mixing and another already in the wheelbarrow. This will allow the mixer operator to work slightly ahead of the troweling operation. 

Installation technique can vary, but one recommendation is to start in the hopper and work toward the shallow end. When installing by this method, begin by applying the Pool-KreteŽ to the vertical areas where the hopper walls join. (See Illustration No. 2.) Work from the top to avoid reaching over in-place Pool-KreteŽ or acciden-tally sliding dirt over the troweled areas. The Pool-KreteŽ should be troweled 1" x 2" onto the pool wall panels and gently tapered down onto the top of the hopper wall. (See Illustration No. 3.) 

Pool-Krete Application Instructions 
Illustration No. 3 

Helpful Hint: On particularly hot days, troweling can be made easier by dipping the trowel into a water bucket kept nearby. 

Helpful Hint: The angles created by the joining of the sloped hopper walls should be as sharp and as well de-fined as possible. Avoid creating a radius at these junctures as it could result in liner wrinkles. 

After connecting all the hopper walls, complete the hopper bottom and work toward the shallow end, placing the Pool-KreteŽ first on either side and working toward the middle of the slope. 

Helpful Hint: The placement of 2" by 2" wood stringers halfway up the hopper wall, parallel to the pool bottom, will allow for accurate placement of desired Pool-KreteŽ thickness assuring the builder straight slopes. 

Installation of Liner 
The vinyl liner may be installed immediately upon completion of the Pool-KreteŽ hard bottom; however, it is recommended that there by no traffic in the pool until the Pool-KreteŽ has had sufficient opportunity to harden. This period will normally be two days depending upon temperature. Traffic in the pool prior to sufficient hard-ening will result in unsightly indentations which serve as collection points for dirt and potential algae. The pool, however, may be filled immediately after liner installation. 

Pool-KreteŽ Usage Chart

This chart represents the typical number of bags of Pool-KreteŽ Premix needed for various types of pool kits. Usage will vary depending on soil types and individual builders, but this table will provide a rough guide for supplying the proper amount of Pool-KreteŽ for different size and type pool kits. 

Pool-Krete Premix Usage Chart
Pool-Krete Premix Usage Chart 
Ask a question about this product.

42lbs Pre-mix Pool Base Bag

Price Using Options Below
Code: Pre-2
Usually Ships In 1-2 Business Days
Choose Bags:
42lbs Pre-mix Pool Base Bag
$ 0 New Available online